Load Management 360-Degree Sercie

No two projects are the same. This makes it all the more important to have an adviser who can provide you with comprehensive answers during all phases of the project. Would you like to plan your load management in advance or equip an already existing production plant with a modern load management system? Janitza electronics supports you from the requirements analysis and the selection of suitable products to the installation and ongoing support of the load management system.

  • 01 Requirements analysis and planning

    • Development of the technical concept
    • Creation of a specification sheet
    • Definition of the interfaces
    • Elaboration of a network plan
    • Creation or adaptation of the hardware plans (EPLAN)
    • Planning of the reporting system and configuration of the visualization interface
  • 02 Production and delivery

    • Supply of the required products (energy meters, current transformers, controllers, etc.)
    • If required, construction and supply of switchgear, sub-distribution boards, etc.
    • Supply of the necessary cable and installation material
  • 03 Assembly and installation

    • Installation of switchgear and sub-distribution boards
    • Extension and conversion of existing switchgear and sub-distribution boards
    • Extension, construction, and installation of cable routes
    • Cable routing and cable connection
  • 04 Setup and Commissioning

    • Programming of the controllers and parameterization of the measuring devices
    • Coordination with the manufacturers of the connected devices (inverters, battery storage units, charging stations, etc.) and parameterization, if necessary
    • If necessary, adaptations to existing PLC controllers (selected manufacturers)
    • Commissioning of the overall function, including training courses
  • 05 Service and support

    • Helpful and professional technology hotline
    • Technical contact for the entire service area
    • Detailed project documentation
    • Automatic e-mail dispatch in case of controller alarms
    • Fast and uncomplicated help via remote maintenance
  • Potential Savings

    • Reduction of expensive peak loads by up to 40%
    • Reduction of charging costs for electric cars by up to 50%
    • Increase in the efficiency of your PV system in conjunction with an electric storage unit by up to 100%
    • Reduction of energy consumption and emissions by up to 15%
    • Increase in the efficiency level of an electric storage unit by up to 50%